Project 10 BILL OF MATERIALS:
- Ravens: 500 US$ pair
- Dome and big bass: 2000 US$ together
- small bass: 450 US$ pair
- crossover: 300 US$ total
- box without front: 100 us$
- fronts: 120 usd
- wheels, terminals, wiring: 150 US$
- Paint, sandpaper, glue, stuffing, stain, brushes, rollers: 50 US$
- TOTAL: bill of material: 3700 US$
Remember, I got very deep discounts for drivers.
SAVINGS:
Tweeter - change for Raven 1 or S-s 9700
ATC: use normal dome, not super
Total savings: maybe 540 US$
Total bill for normalized version: 3100 for a pair.